Ensuring uninterrupted production for a leading automobile manufacturer
Facing a critical situation, the client’s aging demineralization plant in their cataphoresis painting workshop developed a crack in their cationic resin exchanger. This issue had the potential to lead to a plant failure at one of their key sites, posing a significant risk to production continuity. An urgent and effective solution was imperative.
Discover ReAct and secure your water production during emergencies
The Challenge
To improve the reliability of the existing onsite water treatment plant our client contacted Mobile Water Solutions. Due to acid and caustic build up within the existing plant the client requested Mobile Water Solutions to provide a standby longer-term solution in the event of plant failure.
The Solution
Benefiting from their ReAct customer status, Mobile Water Solutions swiftly stepped in. We deployed a mobile reverse osmosis MORO 4x25T in double pass configuration, ensuring water quality of <8µS/cm. Our solution delivered an impressive 12,000m³ of water, sustaining operations for a crucial two-week period.
Benefits
Being a registered ReAct customer paid off significantly. The client experienced an astonishingly rapid response time, with our solution on-site within just six hours of their initial call. This ensured uninterrupted production, sparing the client from production losses and financial setbacks.
With our solution in place for a fortnight, the client enjoyed peace of mind throughout the repair of their demineralization plant, confident that their operations remained stable and secure.