Temporary treatment plant for demineralised water, Germany

1200

Urgent need for demineralised water during repair work at steel mill company

Our client in specializes in the production of steel and upstream products for the manufacturing industry in Europe.

Contact your local team to discuss your project
The Challenge

During extensive repairs to the pipelines of the demineralisation system, our client required a mobile system to replace the on-site water treatment system. This was the only way to maintain normal operations of the steel mill during the two-week period.

The Solution

Mobile Water Solutions provided a process capacity of 125 m³/h permeate with a salt rejection rate exceeding 95% and conductivity of less than 0.1 µS/cm

 

Benefits

Mobile Water Solutions‘ quick response time, with our team onsite within days of an inquiry, helped minimize disruptions and enhance overall efficiency for the site.

Benefits:

  • Rapid delivery, connection and commissioning avoiding disruption to production
  • Project finished within customer’s budget
  • Robust equipment designed for customer needs