Rapid response for a Papermill company, Sweden

Water treatment plant failure due to a breakdown in the boiler (steam dome)
A failure in the water treatment plant occurred due to a breakdown in the boiler’s steam dome, disrupting the facility’s ability to produce the necessary steam for operations. This unexpected issue highlighted the critical role of boiler components in maintaining consistent water treatment performance and overall plant reliability.
Due to a breakdown in the boiler (steam dome), the facility doesn’t have enough boiler feed water to maintain production. In addition, heavy rains have made the raw water quality worse, calling for additional pretreatment.
Mobile Water Solutions’ quick response time, with our team onsite within days of an inquiry, helped minimize disruptions and enhance overall efficiency for the site.
Benefits:
- Enhanced treatment capability with a comprehensive approach to meeting water treatment requirements
- Continued provision of high-quality water and redundancy for uninterrupted operations
- Efficient daily operations for optimal system performance
Discover how to protect your plant against unexpected plant events
Download